This project was an 8MW expansion to the existing 30MW geothermal power plant. It involved the geothermal gathering system piping and equipment erection; heat exchangers & feed pump; oil skiderection; OEC, tank, piping, and transfer pump motive fluid piping; turbine generator erection and alignment, switchgear sheds and power shelter; plant fire fighting system; plant auxiliary systems erection (VRU, pH control & Instrument air system); and associated appurtenances.