Industries
Utility
Services
Design/Bid/Build
Client
Osborne Construction

c/o Eielson Airforce Base / USACE

Bodell Construction’s 24-man crew participated in safety preparation, steam, condensate, sewer and fire line installation for reduced pressure zones and back flow preventers in each building at Eielson Air Force Base, which increases functionality of the new utility lines and code compliance. Bodell replaced and refurbished over ½ mile of utilidor tunnel and over 22,000 linear feet of pipe. This piping supplies steam which is the heating medium for the hangars that house the military’s new F35 fighter jets.

Related Projects

Bayer Furnace 8

Mining

Piping laydown - Industrial value engineering project

Fuel Distribution and Pump House Replacement

Oil & Gas

High Point Compressor Station Wyoming Build

High Point Compressor Station

Oil & Gas