The compressor station for Williams is making a big transformation over the summer with its complex mechanical installation phase at the 20-acre site. Specialized crews and subcontractors work in close coordination for rigging and setting intricate equipment.
The exhaust silencers and stacks now placed into position to advance future combustion outputs. A large pre-engineered metal building (PEMB) is closing in to house and protect giant radiator fans for cooling the compressor Cat engines. Miles of pipeline is also being attached to extend the natural gas flow transport to its final destinations. This High Point compressor station will also allow the gas to be rerouted into storage areas during periods of low demand.