This project included the removal of the existing 60,000 lb. concentrator and generator and replacing it with a new 70,000 lb. concentrator, generator and all related equipment.
The replacement included:
- Compressor
- Heat Exchanger
- Chemical Inductor Pumps
- Fabrication and Installation of all Stainless Steel Piping and Bolt Ups
- Alignment of Pumps and Tanks
- Extended Structure of the Stair Tower
- Modification of Roofing and Platforms to accommodate the new equipment
- Instrumentation