Industries
Oil & Gas
Services
Design/Bid/Build
Client
Williams Midstream

The work at the Burdett Pump Station included performing hot tap, stopple, and bypass of the existing mainline, install all block valves, check valves, basket strainers, skid-mounted pump units, a knockout vessel, a flare, and associated pipe fittings to connect the existing mainline to the new pump units. Work also included setting a power distribution center on concrete pier foundations and making all wire terminations between the power distribution center and field instruments and junction boxes. Also performed was the installation of a 300kVA transformer and making all wire terminations between the transformer and the power distribution center.
The existing mainline contains raw natural gas liquids pumped at approximately 180,000 barrels per day.

Related Projects

Bayer Furnace 8

Mining

Piping laydown - Industrial value engineering project

Fuel Distribution and Pump House Replacement

Oil & Gas

High Point Compressor Station Wyoming Build

High Point Compressor Station

Oil & Gas