Work comprises of general construction, including mechanical and electrical, of facility alterations and additions to Worldport Fuel Farm at the Louisville International Airport. The scope of work includes demolition of earthen berm containment, PCC pavement demolition and restoration, excavation and backfill, utility relocations, and concrete construction. Work also entails construction of (2) two- million gallon API 650 tanks, installation of secondary containment liner, impressed cathodic protection, lightning protection, Jet A fuel piping, tie-ins to active Jet-A fuel pipes, construction of two truck offload stations, construction of three refueler loading stations, replacement and upgrade of standby generator, lighting, controls and instrumentation, upgrade of existing tank gauging, painting, testing, and commissioning.